Pallet Rack for Chattanooga, North Georgia & Northeast Alabama
    Pallet rack rows in a warehouse serving Athens, TN
    Athens, Tennessee · about 55 miles from Chattanooga

    Pallet Racks for Athens, TN Auto-Component Plants

    Automotive component manufacturing anchors the I-75 Exit 49 area in Athens: ignition, exhaust and fuel-system parts. Plants like these store raw stock, work in process, finished parts and heavy tooling under one roof.

    Each of those wants a different kind of rack.

    (423) 810-5886

    Work in Process and Finished Parts

    WIP moves between cells in totes and bins. Carton flow rack at the cell lets operators pull from the front while material handlers reload from the back.

    Finished parts on pallets go in selective pallet rack. Beam levels set to container height keep air out of every bay.

    • Carton flow at the work cell
    • Selective rack for palletized parts
    • Shelving for maintenance spares
    Selective pallet rack aisle like those we lay out in Athens

    Heavy Rack for Dies and Tooling

    Dies and fixtures are dense and heavy. Standard beams are not the answer. We size heavier frames and beams, often with steel decking, so a die sits flat and fully supported.

    Die storage is usually placed near the press, with a clear lane for the truck or crane that moves it. In buildings with crane bays, we keep rack out of the crane path entirely.

    Athens Industrial Parks

    Innovation Park, formerly the I-75 Industrial Park and also called Interstate Industrial Park, covers 350 acres beside I-75 at Exit 49 and Highway 30. Mt. Verd Industrial Park is less than a mile off I-75 at Exit 52 and Highway 305.

    The Redfern Site is an 86-acre, publicly owned, rail-served site about 3 miles from I-75 and 0.2 miles from four-lane US-11. A new build there can be planned with rack in mind from the first drawing.

    Raw Stock at the Receiving End

    Component plants receive coil, tube and bar along with boxed parts. Each needs a place near the machine that uses it.

    Long tube and bar sit well on cantilever arms at the receiving end. Boxed purchased parts go into selective rack between receiving and the cells.

    Keeping raw stock close to receiving shortens every forklift trip into production.

    Supplier Schedules and Install Windows

    Auto suppliers cannot stop shipping. We phase installs by zone, often over weekends or between shifts, and keep line-side material reachable throughout.

    If a plant relocates, our warehouse relocation team moves rack in the same phased way.

    Kicking Off an Athens Plant Layout

    Send your cell layout, container sizes, die weights and crane coverage. A plant drawing is ideal; a marked-up sketch works too.

    We place carton flow at the cells, selective rack for parts and heavy rack for tooling on one CAD drawing. The quote lists every component.

    Installs are phased around your shifts so lines stay supplied.

    Send Your Athens Plant Details

    Call (423) 810-5886 or send the form.

    We respect your privacy. Your information will never be shared.

    Athens Plant Storage FAQs

    Racking an Athens Auto Plant?

    Call (423) 810-5886 to start a layout.

    (423) 810-5886